Your AVEVA is frozen.

Your AVEVA is frozen.

Your production doesn’t have to be.

Your production doesn’t have to be.

System status
AVEVA
Version···Frozen
Security patches···None
New features···None
Support···Running out
With Adasoft
ProductionKeeps running
System status
AVEVA
Version···Frozen
Security patches···None
New features···None
Support···Running out
With Adasoft
ProductionKeeps running

What a frozen version costs you

Security

Cyber threats evolve. Old systems don’t. Without patches, your SCADA and historian become an open door.

Reliability

When an unsupported system fails, spare parts are scarce and the engineers who know it, even scarcer. Every hour of downtime has a cost.

Integration

Every month, the gap grows between your plant and the systems you’ll want to connect to it.

The worst time to migrate is when your plant

has already stopped.

The best time is now: planned, and with a partner who has done it before.

Don’t start from zero. Migrate.

Starting from zero

A new system, rebuilt from scratch

Long shutdowns to switch over

Your team relearns everything

The cost of a full replacement

Migrating with Adasoft

Your process logic and infrastructure, preserved

Production keeps running

Your team keeps working the way it knows

A fraction of the cost: we replace only what’s frozen

How we do it

How we do it

01

Audit without risk

We map your current AVEVA environment — versions, dependencies, critical processes — without touching production.

02

Migration roadmap

We design a step-by-step plan adapted to your plant. No theoretical templates — a real plan for your real operation.

03

Zero-downtime execution

We execute the migration with your team, validating each phase before moving forward. Production keeps running throughout.

01

Audit without risk

We map your current AVEVA environment — versions, dependencies, critical processes — without touching production.

02

Migration roadmap

We design a step-by-step plan adapted to your plant. No theoretical templates — a real plan for your real operation.

03

Zero-downtime execution

We execute the migration with your team, validating each phase before moving forward. Production keeps running throughout.

A leading pharmaceutical manufacturer needed to renew its AVEVA System Platform and Batch Management:

800+

connected PLCs

2,300+

screens

60,000+

objects

30,000+

historian tags

The plant couldn’t stop.

It didn’t have to.

Full system migration while production kept running.

It wasn’t a one-off. It’s how we migrate.

0%

Production downtime during our migrations.

5,000+

Automation and MES projects delivered, many in GMP-regulated environments.

40+

Years in industrial automation and process digitalization, in LATAM, North America and EMEA.

Let’s look at your AVEVA together.

Tell us which version you’re running, and we’ll show you how we’d migrate it without stopping your plant.

Contact Us

Got a question or want us to reach out?

Drop us a line—we’ll get back to you as soon as possible.

Contact Us

Got a question or want us to reach out?

Drop us a line—we’ll get back to you as soon as possible.

Contact Us

Got a question or want us to reach out?

Drop us a line—we’ll get back to you as soon as possible.

Some of our clients

Some of our clients

Some of our clients